Landline : 033-511-7820 to 29 | 24/7 Mobile Hotline : 0998-989-3028 ogm@ileco1.org

Your Title Goes Here

Your content goes here. Edit or remove this text inline or in the module Content settings. You can also style every aspect of this content in the module Design settings and even apply custom CSS to this text in the module Advanced settings.

Your Title Goes Here

Your content goes here. Edit or remove this text inline or in the module Content settings. You can also style every aspect of this content in the module Design settings and even apply custom CSS to this text in the module Advanced settings.

Your Title Goes Here

Your content goes here. Edit or remove this text inline or in the module Content settings. You can also style every aspect of this content in the module Design settings and even apply custom CSS to this text in the module Advanced settings.

Your Title Goes Here

Your content goes here. Edit or remove this text inline or in the module Content settings. You can also style every aspect of this content in the module Design settings and even apply custom CSS to this text in the module Advanced settings.

Your Title Goes Here

Your content goes here. Edit or remove this text inline or in the module Content settings. You can also style every aspect of this content in the module Design settings and even apply custom CSS to this text in the module Advanced settings.

ANNOUNCEMENT

BID BULLETIN

BID BULLETIN

This is to respectfully submit the pdf file copy of ILECO I Bid Bulletin for ITB No. 2025-016: "Purchase of Transformer Loss Tester and Analyzer for posting". Please be informed of the following amendments/supplemental to the bidding documents....

read more
BID BULLETIN

BID BULLETIN

This is to respectfully submit the pdf file copy of ILECO I Bid Bulletin for ITB No. 2025-006: "Supply and Delivery of Calendars for Year 2026". Please be informed of the following amendments/supplemental to the bidding documents. This shall...

read more

COMPETITIVE SELECTION PROCESS

No Results Found

The page you requested could not be found. Try refining your search, or use the navigation above to locate the post.

POWER ADVISORY

No Results Found

The page you requested could not be found. Try refining your search, or use the navigation above to locate the post.

FACEBOOK FEED

Iloilo I Electric Cooperative, Inc.
Iloilo I Electric Cooperative, Inc.Friday, August 28th, 2026 at 10:58am
VISAYAS GRID ALERT STATUS
Update as of 28 August 2026, 8AM

Red Alert
5:00PM- 8:00PM

Yellow Alert
2:00PM- 5:00PM
8:00PM- 10:00PM

Available Capacity - 2,307MW
Peak Demand - 2,402MW

10 plants are on forced outage on August 2026, 1 plant since July, 3 plants since June, 7 plants since May, 1 plant since March, 3 plants since 2025, 2 plants since 2024, 2 plants since 2023, and 1 plant since 2021, while 16 plants are running on derated capacities, for a total of 979.6MW unavailable to the grid.

Factor/s that contributed to the RED and YELLOW Alert declarations:

1. Unavailability of Visayas' large coal plants TVI 1, TVI 2 and KSPC 1
2. Limited power import from Mindanao

A red alert status is issued when power supply is insufficient to meet consumer demand and the transmission gridโ€™s regulating requirement.

A yellow alert is issued when the operating margin is insufficient to meet the transmission gridโ€™s contingency requirement.

#NGCPAdvisory
Iloilo I Electric Cooperative, Inc.
Iloilo I Electric Cooperative, Inc.Friday, August 28th, 2026 at 9:00am
๐—–๐—ข๐—ข๐—ฃ ๐—–๐—”๐—ฅ๐—˜๐—ฆ: ๐—™๐—˜๐—˜๐——๐—œ๐—ก๐—š ๐—ฃ๐—ฅ๐—ข๐—š๐—ฅ๐—”๐—  ๐—”๐—ก๐—— ๐—›๐—”๐—ก๐——๐—ข๐—š ๐—š๐—”๐— ๐—œ๐—ง ๐—ฃ๐—”๐—ก๐—š-๐—˜๐—ฆ๐—ž๐—ช๐—˜๐—Ÿ๐—”

August 26, 2026 โ€“ ILECO I successfully conducted the COOP CARES: Feeding Program and Handog Gamit Pang-Eskwela at Sinamay Elementary School, Brgy. Sinamay, Alimodian, benefiting 165 learners through the distribution of essential school supplies and a feeding activity under the Cooperativeโ€™s Corporate Social Responsibility (CSR) Program.

The initiative aimed to support the educational and nutritional needs of young learners while promoting the Cooperativeโ€™s commitment to community development and inclusive service. Through this activity, ILECO I provided students with essential school supplies and nutritious meals to help support them throughout the ongoing school year.

The COOP CARES Program reflects ILECO Iโ€™s continuing dedication to creating meaningful and lasting impact beyond electrification by investing in the welfare, education, and future of the communities it serves.

Through initiatives like this, ILECO I continues to uphold its commitment to making a positive difference in the lives of its Member-Consumer-Owners and the communities it serves.

โ€œ๐—ž๐—”๐—ฅ๐—œ ๐—ž๐—”๐— ๐—ข, ๐—จ๐—ฃ๐—ข๐—— ๐—ž๐—œ๐—ง๐—”, ๐—”๐—ง๐—ข๐—ก ๐—œ๐—ก๐—œโ€
Iloilo I Electric Cooperative, Inc.
Iloilo I Electric Cooperative, Inc.Friday, August 28th, 2026 at 5:29am
AUGUST 27, 2026: CLEARING ACTIVITIES IN LEGANES!

โ€œREPUBLIC ACT 11361 - Anti-Obstruction of Power Lines Actโ€ - to ensure uninterrupted supply of power from generating plants to end-users and protects the reliability of power lines by keeping the surrounding land, air space and the area traversed by power lines free from any form of obstruction.

For any concerns, you may contact us thru this page, 0917-314-4006 or (033) 511-7820 to 29 local 102 from Monday to Friday except Holidays, 8am to 5pm.

For 24/7 Consumer Care Hotline, contact us at 0998-989-3028 or (033) 511-8138.

#coopkopalanggako
#karikamoupodkitaatonini
Iloilo I Electric Cooperative, Inc.
Iloilo I Electric Cooperative, Inc.Thursday, August 27th, 2026 at 11:01pm
๐—ก๐—ข๐—ง๐—œ๐—–๐—˜ ๐—ข๐—™ ๐—จ๐—ก๐—ฆ๐—–๐—›๐—˜๐——๐—จ๐—Ÿ๐—˜๐—— ๐—ฃ๐—ข๐—ช๐—˜๐—ฅ ๐—œ๐—ก๐—ง๐—˜๐—ฅ๐—ฅ๐—จ๐—ฃ๐—ง๐—œ๐—ข๐—ก
๐Ÿ—“๏ธAugust 27, ๐Ÿฎ๐Ÿฌ๐Ÿฎ๐Ÿฒ, THURSDAY
๐Ÿ•’ ๐—ง๐—œ๐— ๐—˜ ๐—ฆ๐—ง๐—”๐—ฅ๐—ง๐—˜๐——: 9:37 ๐—ฃ.๐— .

๐Ÿšง๐—ฆ๐—ง๐—”๐—ง๐—จ๐—ฆ: Portion of Feeder 21 of the Guimbal Substation tripped. Tracing of backbone lines is ongoing for immediate power restoration.

๐Ÿ“Œ AFFECTED AREAS:

P๐—ข๐—ฅ๐—ง๐—œ๐—ข๐—ก ๐—ข๐—™ IGBARAS:
1. ANILAWAN
2. BAGACAY
3. BAGAY
4. BARASAN
5. BINANUA-AN
6. BRGY. 1
7. BRGY. 2
8. BRGY. 3
9. BRGY. 4
10. BRGY. 5
11. BRGY. 6
12. BUGA
13. BUGNAY
14. CALE
15. CATIRINGAN
16. CORUCO-AN
17. IGCABUGAO
18. IGTALONGON
19. INDALUYON
20. JOVELLAR
21. KINAGDAN
22. LAB-ON
23. MULANGAN
24. PASONG
25. PASSI
26. PINAOPAWAN
27. RIRO-AN
28. SAN AMBROSIO
29. SIGNE
30. TIGBANABA

P๐—ข๐—ฅ๐—ง๐—œ๐—ข๐—ก ๐—ข๐—™ GUIMBAL:
1. ANONO-O
2. BULAD
3. IYASAN
4. LUBACAN
5. NITO-AN LUPSAG
6. STA. ROSA-LAGUNA (PORTION)
7. PARTICION

Please be informed that unscheduled power interruption happened without prior notice.

We humbly ask for your understanding on this matter. Thank you and keep safe.
Iloilo I Electric Cooperative, Inc.
Iloilo I Electric Cooperative, Inc.Thursday, August 27th, 2026 at 7:31pm
AUGUST 27, ๐Ÿฎ๐Ÿฌ๐Ÿฎ๐Ÿฒ: ๐—ฃ๐—ข๐—ช๐—˜๐—ฅ ๐—”๐——๐—ฉ๐—œ๐—ฆ๐—ข๐—ฅ๐—ฌ - ๐— ๐—”๐—ก๐—จ๐—”๐—Ÿ ๐—Ÿ๐—ข๐—”๐—— ๐——๐—ฅ๐—ข๐—ฃ๐—ฃ๐—œ๐—ก๐—š ๐—•๐—ฌ ๐—ก๐—š๐—–๐—ฃ

๐Ÿ•’ ๐—ง๐—œ๐— ๐—˜:
Start: 8:00 P.M.
End: 9:20 P.M.

๐Ÿšง ๐—ฅ๐—˜๐—”๐—ฆ๐—ข๐—ก: NGCP requested the implementation of Manual Load Dropping due to power generation deficiency (Red Alert Status). ILECO I implemented Manual Load Dropping (MLD) in the following areas:

๐Ÿ“Œ ๐—”๐—™๐—™๐—˜๐—–๐—ง๐—˜๐—— ๐—”๐—ฅ๐—˜๐—”๐—ฆ:
FEEDER 9a - San Miguel Substation
FEEDER 11a - Pavia Substation

We appeal for your understanding regarding this NGCP-initiated unscheduled power interruption. Rest assured that power will be restored upon clearance from the National Grid Corporation of the Philippines.

Thank you for your patience, understanding, and cooperation.