Landline : 033-511-7820 to 29 | 24/7 Mobile Hotline : 0998-989-3028 ogm@ileco1.org

Your Title Goes Here

Your content goes here. Edit or remove this text inline or in the module Content settings. You can also style every aspect of this content in the module Design settings and even apply custom CSS to this text in the module Advanced settings.

Your Title Goes Here

Your content goes here. Edit or remove this text inline or in the module Content settings. You can also style every aspect of this content in the module Design settings and even apply custom CSS to this text in the module Advanced settings.

Your Title Goes Here

Your content goes here. Edit or remove this text inline or in the module Content settings. You can also style every aspect of this content in the module Design settings and even apply custom CSS to this text in the module Advanced settings.

Your Title Goes Here

Your content goes here. Edit or remove this text inline or in the module Content settings. You can also style every aspect of this content in the module Design settings and even apply custom CSS to this text in the module Advanced settings.

Your Title Goes Here

Your content goes here. Edit or remove this text inline or in the module Content settings. You can also style every aspect of this content in the module Design settings and even apply custom CSS to this text in the module Advanced settings.

ANNOUNCEMENT

BID BULLETIN

BID BULLETIN

This is to respectfully submit the pdf file copy of ILECO I Supplemental Bid Bulletin No. 2026-017A for ITB No.2026-002-RB for the "Supply of Labor and Materials for the Construction of Distribution Lines and Installation of Housewiring of 47...

read more
BID BULLETIN

BID BULLETIN

This is to respectfully submit the pdf file copy of ILECO I Supplemental Bid Bulletin No. 2026-018 for ITB No.2026-003 for the "Purchase of Five (5) Generator Sets (Rebidding)". Please be informed of the following amendments/supplemental to the...

read more
BID BULLETIN

BID BULLETIN

This is to respectfully submit the pdf file copy of ILECO I Supplemental Bid Bulletin No. 2026-015 for ITB No.2026-003 for the "Supply of Labor and Materials for the Construction of Distribution Lines and Installation of Housewiring of 47 Sitios...

read more

COMPETITIVE SELECTION PROCESS

POWER ADVISORY

No Results Found

The page you requested could not be found. Try refining your search, or use the navigation above to locate the post.

FACEBOOK FEED

Iloilo I Electric Cooperative, Inc.
Iloilo I Electric Cooperative, Inc.Wednesday, September 16th, 2026 at 12:01pm
𝗠𝗢𝗡𝗧𝗛𝗟𝗬 𝗙𝗢𝗥𝗠𝗔𝗧𝗜𝗢𝗡 𝗢𝗙 𝗖𝗢𝗢𝗣𝗘𝗥𝗔𝗧𝗜𝗩𝗘 𝗦𝗘𝗖𝗨𝗥𝗜𝗧𝗬 𝗚𝗨𝗔𝗥𝗗𝗦

Earlier today, Safety Officer Mr. Ronaldo B. Suitado conducted the regular formation and orientation of ILECO I’s security personnel. The activity focused on safety protocols, security reminders, and the concerns and welfare of our guards.

Regular formation helps keep our security personnel prepared and guided in performing their duties. Regular police visibility and coordination with law enforcement authorities also help strengthen security and ensure a safe environment for our employees, Member-Consumer-Owners (MCOs), and visitors.

ILECO I remains committed to maintaining safety and security in our facilities while providing courteous and reliable service to our MCOs.

We value your feedback, as it helps us continuously improve our safety and security services. If you have any concerns regarding our security personnel or services, please contact us:
📱 Mobile: 0917-314-4006
☎️ Landline: (033) 511-7820 to 7829

"KARI KAMO, UPOD KITA, ATON INI"
Iloilo I Electric Cooperative, Inc.
Iloilo I Electric Cooperative, Inc.Wednesday, September 16th, 2026 at 9:07am
⚡️ 𝗔𝗡𝗧𝗜-𝗢𝗕𝗦𝗧𝗥𝗨𝗖𝗧𝗜𝗢𝗡 𝗢𝗙 𝗣𝗢𝗪𝗘𝗥 𝗟𝗜𝗡𝗘𝗦 𝗔𝗖𝗧
𝗥𝗲𝗽𝘂𝗯𝗹𝗶𝗰 𝗔𝗰𝘁 𝗡𝗼. 𝟭𝟭𝟯𝟲𝟭

Power distribution lines need 𝗰𝗹𝗲𝗮𝗿 𝗮𝗻𝗱 𝘂𝗻𝗼𝗯𝘀𝘁𝗿𝘂𝗰𝘁𝗲𝗱 𝗰𝗼𝗿𝗿𝗶𝗱𝗼𝗿𝘀 to ensure the safe, reliable, and continuous delivery of electricity to our Member-Consumer-Owners.

Under 𝗥𝗲𝗽𝘂𝗯𝗹𝗶𝗰 𝗔𝗰𝘁 𝗡𝗼. 𝟭𝟭𝟯𝟲𝟭, certain obstructions and activities within power line corridors are prohibited, including:

🌳 𝗧𝗮𝗹𝗹-𝗴𝗿𝗼𝘄𝗶𝗻𝗴 𝗽𝗹𝗮𝗻𝘁𝘀
🏠 𝗛𝗮𝘇𝗮𝗿𝗱𝗼𝘂𝘀 𝗶𝗺𝗽𝗿𝗼𝘃𝗲𝗺𝗲𝗻𝘁𝘀
🔥 𝗛𝗮𝘇𝗮𝗿𝗱𝗼𝘂𝘀 𝗮𝗰𝘁𝗶𝘃𝗶𝘁𝗶𝗲𝘀
🚧 𝗗𝗲𝗻𝘆𝗶𝗻𝗴 𝗮𝘂𝘁𝗵𝗼𝗿𝗶𝘇𝗲𝗱 𝗮𝗰𝗰𝗲𝘀𝘀
⚠️ 𝗢𝘁𝗵𝗲𝗿 𝗼𝗯𝘀𝘁𝗿𝘂𝗰𝘁𝗶𝗼𝗻𝘀

The law also provides 𝗽𝗲𝗻𝗮𝗹𝘁𝗶𝗲𝘀 𝗳𝗼𝗿 𝘃𝗶𝗼𝗹𝗮𝘁𝗶𝗼𝗻𝘀, as indicated in the infographic.

📌 Before 𝗽𝗹𝗮𝗻𝘁𝗶𝗻𝗴, 𝗯𝘂𝗶𝗹𝗱𝗶𝗻𝗴, 𝗲𝘅𝗰𝗮𝘃𝗮𝘁𝗶𝗻𝗴, 𝗼𝗿 𝗰𝗼𝗻𝗱𝘂𝗰𝘁𝗶𝗻𝗴 𝗮𝗰𝘁𝗶𝘃𝗶𝘁𝗶𝗲𝘀 𝗻𝗲𝗮𝗿 𝗽𝗼𝘄𝗲𝗿 𝗹𝗶𝗻𝗲𝘀, make sure proper clearances and applicable requirements are observed.

💡 𝗛𝗘𝗟𝗣 𝗞𝗘𝗘𝗣 𝗢𝗨𝗥 𝗣𝗢𝗪𝗘𝗥 𝗟𝗜𝗡𝗘𝗦 𝗦𝗔𝗙𝗘.

Together, let us help protect the 𝗿𝗲𝗹𝗶𝗮𝗯𝗶𝗹𝗶𝘁𝘆 𝗮𝗻𝗱 𝗰𝗼𝗻𝘁𝗶𝗻𝘂𝗼𝘂𝘀 𝗰𝗼𝗻𝘃𝗲𝘆𝗮𝗻𝗰𝗲 𝗼𝗳 𝗲𝗹𝗲𝗰𝘁𝗿𝗶𝗰𝗶𝘁𝘆 in our communities.

"𝗞𝗔𝗥𝗜 𝗞𝗔𝗠𝗢, 𝗨𝗣𝗢𝗗 𝗞𝗜𝗧𝗔, 𝗔𝗧𝗢𝗡 𝗜𝗡𝗜"
Iloilo I Electric Cooperative, Inc.
Iloilo I Electric Cooperative, Inc.Wednesday, September 16th, 2026 at 9:00am
𝗡𝗢𝗧𝗜𝗖𝗘 𝗢𝗙 𝗦𝗖𝗛𝗘𝗗𝗨𝗟𝗘𝗗 𝗣𝗢𝗪𝗘𝗥 𝗜𝗡𝗧𝗘𝗥𝗥𝗨𝗣𝗧𝗜𝗢𝗡
🗓️ 𝗦𝗘𝗣𝗧𝗘𝗠𝗕𝗘𝗥 𝟭𝟴, 𝟮𝟬𝟮𝟲 (𝗙𝗥𝗜𝗗𝗔𝗬)
🕗 𝟴:𝟬𝟬 𝗔.𝗠. – 𝟰:𝟬𝟬 𝗣.𝗠. ( 𝟴 𝗛𝗢𝗨𝗥𝗦 )

🚧 𝗥𝗘𝗔𝗦𝗢𝗡:
To conduct clearing of vegetation along three-phase primary line from Leong to Jelicuon Montinola, Cabatuan.

📍 𝗔𝗙𝗙𝗘𝗖𝗧𝗘𝗗 𝗔𝗥𝗘𝗔𝗦:

𝗣𝗢𝗥𝗧𝗜𝗢𝗡 𝗢𝗙 𝗖𝗔𝗕𝗔𝗧𝗨𝗔𝗡:
1. Leong
2. Ayong
3. Maraguit
4. Anuang
5. Puyas
6. Cagban
7. Cadoldolan
8. Inaladan
9. Jelicuon Montinola
10. Jelicuon Lusaya
11. Jelicuon Baron
12. Pacatin
13. Janipaan Central
14. Janipaan Este
15. Zone XI (Bypass Road to Sitio Pandan)
16. Zacarias Subdivision

We humbly ask for your understanding regarding this scheduled power interruption.

⚠️ Power may be restored earlier than the scheduled restoration time if work is completed ahead of schedule. Please consider all lines and electrical equipment energized at all times.

Cc:
📻 DYOK – Aksyon Radyo
📻 DYFM – Bombo Radyo
📻 DYRI – RMN Iloilo
📻 DYIS – Radyo Kahilwayan Sta. Barbara
Iloilo I Electric Cooperative, Inc.
Iloilo I Electric Cooperative, Inc.Wednesday, September 16th, 2026 at 8:30am
⚡ 𝗣𝗢𝗦𝗜𝗕𝗟𝗘 𝗠𝗔𝗡𝗨𝗔𝗟 𝗟𝗢𝗔𝗗 𝗗𝗥𝗢𝗣𝗣𝗜𝗡𝗚 𝗦𝗔𝗡𝗚 𝗡𝗚𝗖𝗣

Ginaabisuhan ang tanan nga Miyembro-Konsumidor sang ILECO I nga magpreparar para sa 𝗣𝗢𝗦𝗜𝗕𝗟𝗘 𝗡𝗚𝗔 𝗥𝗢𝗧𝗔𝗧𝗜𝗢𝗡𝗔𝗟 𝗕𝗥𝗢𝗪𝗡𝗢𝗨𝗧 subong nga adlaw, September 16, 2026, halin 4:00 PM - 8:00 P.M.

Ini nga brownout posible nga matabo kon magpatuman sang Manual Load Dropping (MLD) nga ginamando sang National Grid Corporation of the Philippines (NGCP) bangod sa kakulang sang suplay sang kuryente sa Visayas Grid.

Amon igaanunsyo ang mga feeder kag oras nga mahimo maapektuhan kon magpatuman sang MLD.

*𝗡𝗼𝘁𝗲: Ang oras sang pagpatuman sang Manual Load Dropping (MLD) sang NGCP mahimo nga ma-cancel ukon ma-extend depende sa aktuwal nga kondisyon sang power system kag grid, lakip na ang pagbag-o sang suplay kag demand sang kuryente.*

Nagapangayo kami sang inyo lubos nga paghangop kag kooperasyon parte sa sini nga sitwasyon.

Reference: NGCP post as of 8:00 A.M.
https://www.facebook.com/share/p/1D5gj7nUFH/
Iloilo I Electric Cooperative, Inc.
Iloilo I Electric Cooperative, Inc.Wednesday, September 16th, 2026 at 8:14am
VISAYAS GRID ALERT STATUS
Update as 16 September 2026, 8AM

Red Alert
5:00PM- 6:00PM

Yellow Alert
4:00PM- 5:00PM
6:00PM- 8:00PM

Available Capacity - 2,536MW
Peak Demand - 2,538MW

8 plants are on forced outage on September, 3 plants since August 2026, 1 plant since July, 2 plants since June, 7 plants since May, 3 plants since 2025, 2 plants since 2024, 2 plants since 2023, and 1 plant since 2021, while 15 plants are running on derated capacities, for a total of 774.2MW unavailable to the grid.

Factor/s that contributed to the RED and YELLOW Alert declarations:
1. Unavailability of Visayas' large coal plants TVI 1 and PEDC 3
2. Limited power import from the Mindanao Grid


A red alert status is issued when power supply is insufficient to meet consumer demand and the transmission grid’s regulating requirement.

A yellow alert is issued when the operating margin is insufficient to meet the transmission grid’s contingency requirement.

#NGCPAdvisory
#gridalertph