Landline : 033-511-7820 to 29 | 24/7 Mobile Hotline : 0998-989-3028 ogm@ileco1.org

Your Title Goes Here

Your content goes here. Edit or remove this text inline or in the module Content settings. You can also style every aspect of this content in the module Design settings and even apply custom CSS to this text in the module Advanced settings.

Your Title Goes Here

Your content goes here. Edit or remove this text inline or in the module Content settings. You can also style every aspect of this content in the module Design settings and even apply custom CSS to this text in the module Advanced settings.

Your Title Goes Here

Your content goes here. Edit or remove this text inline or in the module Content settings. You can also style every aspect of this content in the module Design settings and even apply custom CSS to this text in the module Advanced settings.

Your Title Goes Here

Your content goes here. Edit or remove this text inline or in the module Content settings. You can also style every aspect of this content in the module Design settings and even apply custom CSS to this text in the module Advanced settings.

Your Title Goes Here

Your content goes here. Edit or remove this text inline or in the module Content settings. You can also style every aspect of this content in the module Design settings and even apply custom CSS to this text in the module Advanced settings.

ANNOUNCEMENT

INVITATION TO BID

INVITATION TO BID

Project Title: โ€œSUPPLY AND DELIVERY OF CONDUCTORS FOR YEAR 2022โ€. Approved Budget for the Contract (ABC) : FOUR MILLION THREE HUNDRED NINETY THOUSAND FIVE HUNDRED PESOS (PHP 4,390,500.00).

read more
INVITATION TO BID

INVITATION TO BID

Project Title: REBIDDING OF โ€œSUPPLY AND DELIVERY OF 15,000 UNITS OF SINGLE PHASE ELECTRONIC METER FOR YEAR 2022โ€. Approved Budget for the Contract (ABC) : TWENTY-FIVE MILLION FIVE HUNDRED THOUSAND PESOS (PHP 25,500,000.00).

read more

COMPETITIVE SELECTION PROCESS

No Results Found

The page you requested could not be found. Try refining your search, or use the navigation above to locate the post.

POWER ADVISORY

No Results Found

The page you requested could not be found. Try refining your search, or use the navigation above to locate the post.

FACEBOOK FEED

Iloilo I Electric Cooperative, Inc.
Iloilo I Electric Cooperative, Inc.Tuesday, July 14th, 2026 at 9:00am
๐—ก๐—ข๐—ง๐—œ๐—–๐—˜ ๐—ข๐—™ ๐—ก๐—š๐—–๐—ฃ ๐—ฆ๐—–๐—›๐—˜๐——๐—จ๐—Ÿ๐—˜๐—— ๐—ฃ๐—ข๐—ช๐—˜๐—ฅ ๐—œ๐—ก๐—ง๐—˜๐—ฅ๐—ฅ๐—จ๐—ฃ๐—ง๐—œ๐—ข๐—ก
๐Ÿ—“๏ธ ๐—๐—จ๐—Ÿ๐—ฌ ๐Ÿญ๐Ÿต, ๐Ÿฎ๐Ÿฌ๐Ÿฎ๐Ÿฒ (๐—ฆ๐—จ๐—ก๐——๐—”๐—ฌ)
๐Ÿ•• ๐Ÿฒ:๐Ÿฌ๐Ÿฌ ๐—”.๐— . ๐—ง๐—ข ๐Ÿณ:๐Ÿฌ๐Ÿฌ ๐—”.๐— . (๐Ÿญ ๐—›๐—ข๐—จ๐—ฅ)
๐Ÿ•” ๐Ÿฑ:๐Ÿฌ๐Ÿฌ ๐—ฃ.๐— . ๐—ง๐—ข ๐Ÿฒ:๐Ÿฌ๐Ÿฌ ๐—ฃ.๐— . (๐Ÿญ ๐—›๐—ข๐—จ๐—ฅ)

๐Ÿšง ๐—ฅ๐—˜๐—”๐—ฆ๐—ข๐—ก:
Request for power interruption of the National Grid Corporation of the Philippines (NGCP) to facilitate the transfer of the 69kV Sta. Barbaraโ€“Ingore Transmission Line load to the 100 MVA Mobile Transformer No. 2 in preparation for the planned maintenance of 50 MVA Transformer No. 1, including its associated High-Voltage Equipment (HVE) and protection relays at the Sta. Barbara Substation. A second one-hour interruption from 5:00 P.M. to 6:00 P.M. will be implemented to transfer the load back to 50 MVA Transformer No. 1 upon completion of the maintenance works.

๐Ÿ“Œ ๐—”๐—™๐—™๐—˜๐—–๐—ง๐—˜๐—— ๐—”๐—ฅ๐—˜๐—”๐—ฆ:

๐—”. ๐—ช๐—›๐—ข๐—Ÿ๐—˜ ๐— ๐—จ๐—ก๐—œ๐—–๐—œ๐—ฃ๐—”๐—Ÿ๐—œ๐—ง๐—ฌ ๐—ข๐—™ ๐—–๐—”๐—•๐—”๐—ง๐—จ๐—”๐—ก

๐—•. ๐—ช๐—›๐—ข๐—Ÿ๐—˜ ๐— ๐—จ๐—ก๐—œ๐—–๐—œ๐—ฃ๐—”๐—Ÿ๐—œ๐—ง๐—ฌ ๐—ข๐—™ ๐—Ÿ๐—˜๐—š๐—”๐—ก๐—˜๐—ฆ

๐—–. ๐—ช๐—›๐—ข๐—Ÿ๐—˜ ๐— ๐—จ๐—ก๐—œ๐—–๐—œ๐—ฃ๐—”๐—Ÿ๐—œ๐—ง๐—ฌ ๐—ข๐—™ ๐— ๐—”๐—”๐—ฆ๐—œ๐—ก, ๐—˜๐—ซ๐—–๐—˜๐—ฃ๐—ง:
1. Sitio Ignaripay, Siwalo
2. Linab
3. Punong

๐——. ๐—ช๐—›๐—ข๐—Ÿ๐—˜ ๐— ๐—จ๐—ก๐—œ๐—–๐—œ๐—ฃ๐—”๐—Ÿ๐—œ๐—ง๐—ฌ ๐—ข๐—™ ๐—ฆ๐—”๐—ก ๐— ๐—œ๐—š๐—จ๐—˜๐—Ÿ, ๐—˜๐—ซ๐—–๐—˜๐—ฃ๐—ง:
1. San Jose
2. San Antonio
3. Sto. Angel

๐—˜. ๐—ช๐—›๐—ข๐—Ÿ๐—˜ ๐— ๐—จ๐—ก๐—œ๐—–๐—œ๐—ฃ๐—”๐—Ÿ๐—œ๐—ง๐—ฌ ๐—ข๐—™ ๐—ฆ๐—ง๐—”. ๐—•๐—”๐—ฅ๐—•๐—”๐—ฅ๐—”, ๐—˜๐—ซ๐—–๐—˜๐—ฃ๐—ง:
1. Cabugao Norte
2. Portion of Lupa (near Circumferential Road Bridge going to Bolong Este)
3. Jibao-an
4. Balabag

๐—™. ๐—ฃ๐—ข๐—ฅ๐—ง๐—œ๐—ข๐—ก ๐—ข๐—™ ๐—ฃ๐—”๐—ฉ๐—œ๐—”:
1. Amparo
2. Mali-ao
3. Pal-Agon
4. Portion of Cabugao Sur (along Vice President Fernando Lopez Avenue)

๐—š. ๐—ฃ๐—ข๐—ฅ๐—ง๐—œ๐—ข๐—ก ๐—ข๐—™ ๐—”๐—Ÿ๐—œ๐— ๐—ข๐——๐—œ๐—”๐—ก:
1. Sulong
2. Sinamay
3. Manguining
4. Coline
5. Dalag

We humbly ask for your understanding regarding this NGCP scheduled power interruption.

โš ๏ธ Power may be restored earlier than or as scheduled. Please consider all lines and electrical equipment energized at all times.

๐—–๐—ฐ:
๐——๐—ฌ๐—ข๐—ž โ€“ Aksyon Radyo
๐——๐—ฌ๐—™๐—  โ€“ Bombo Radyo
๐——๐—ฌ๐—ฅ๐—œ โ€“ RMN Iloilo
๐——๐—ฌ๐—œ๐—ฆ โ€“ Radyo Kahilwayan Sta. Barbara
Iloilo I Electric Cooperative, Inc.
Iloilo I Electric Cooperative, Inc.Tuesday, July 14th, 2026 at 5:59am
Appreciation Post๐Ÿ’–
Iloilo I Electric Cooperative, Inc.
Iloilo I Electric Cooperative, Inc.Monday, July 13th, 2026 at 8:57pm
Appreciation Post๐Ÿ’–
Iloilo I Electric Cooperative, Inc.
Iloilo I Electric Cooperative, Inc.Monday, July 13th, 2026 at 1:29pm
Appreciation Post๐Ÿ’–
Iloilo I Electric Cooperative, Inc.
Iloilo I Electric Cooperative, Inc.Monday, July 13th, 2026 at 1:25pm
Appreciation Post๐Ÿ’–